+86 400-816-6687 +86 13316038150

ZH-OM81 Washing Machine Performance Laboratory

Non-standard products
Delivery
Free delivery
400-816-6687

ZH-OM81 Washing Machine Performance Laboratory

1. Equipment Overview

This equipment is developed in accordance with GB/T4288-2018 "Electric Washing Machines for Household and Similar Purposes". The system integrates electrical parameters, temperature, pressure, and flow, can record the test process curve throughout the process, and supports data query, analysis, and report generation. It can be used for "power consumption and water consumption" project testing.

2. Technical parameters

Test station: 60 stations, two rows, each row arranged back to back

Test voltage: 220v 50HZ / variable frequency power (excluding variable frequency power supply)

Voltage measurement range: (100~300)V

Current measurement range: (0~20)A

Flow measurement range: (0.01~30)L/min, and convert and calculate the water consumption each time

Pressure measurement range: (0~1)MPa‍ (equipped with constant temperature and constant pressure water supply system)

Water temperature measurement range: (room temperature~100)℃, 4 sets of external thermocouples are provided

3. System composition:

The test system collects the following test data for each test station: power, voltage, current, cumulative power, water flow, temperature, and time.

1. Test voltage: 100~300V, accuracy 0.5 level

2. Test current: 0~20A, accuracy 0.5 level

3. Test power: 0~5 kW, accuracy 0.5 level

4. Constant temperature and constant pressure water supply: Constant temperature and constant pressure water supply 0.1~1.0Mpa adjustable, temperature room temperature~55°C adjustable, can also be connected to tap water, tap water and constant temperature and constant pressure water can be switched between each other.


ZH-OM81 Washing Machine Performance Laboratory

1. Equipment Overview

This equipment is developed in accordance with GB/T4288-2018 "Electric Washing Machines for Household and Similar Purposes". The system integrates electrical parameters, temperature, pressure, and flow, can record the test process curve throughout the process, and supports data query, analysis, and report generation. It can be used for "power consumption and water consumption" project testing.

2. Technical parameters

Test station: 60 stations, two rows, each row arranged back to back

Test voltage: 220v 50HZ / variable frequency power (excluding variable frequency power supply)

Voltage measurement range: (100~300)V

Current measurement range: (0~20)A

Flow measurement range: (0.01~30)L/min, and convert and calculate the water consumption each time

Pressure measurement range: (0~1)MPa‍ (equipped with constant temperature and constant pressure water supply system)

Water temperature measurement range: (room temperature~100)℃, 4 sets of external thermocouples are provided

3. System composition:

The test system collects the following test data for each test station: power, voltage, current, cumulative power, water flow, temperature, and time.

1. Test voltage: 100~300V, accuracy 0.5 level

2. Test current: 0~20A, accuracy 0.5 level

3. Test power: 0~5 kW, accuracy 0.5 level

4. Constant temperature and constant pressure water supply: Constant temperature and constant pressure water supply 0.1~1.0Mpa adjustable, temperature room temperature~55°C adjustable, can also be connected to tap water, tap water and constant temperature and constant pressure water can be switched between each other.

All reviews0

Zhipinhui After-Sales Policy:


*After-Sales Hotline: +864008166687


1. Our company has assembled a team of experienced field engineers and senior technicians to promptly respond

to any equipment issues and provide after-sales maintenance.


2. Within China, within one week of new product delivery, our after-sales technical staff will install the equipment and

provide after-sales training at the customer's location, using the contact information and address provided by the  customer.


3. All complaints related to product quality will be responded to within one hour. Within 3-5 hours within the province,

and within 24-48 hours outside the province, we will arrive at the customer's site,

determine the appropriate action based on the complaint, and provide after-sales repairs. (Domestic)


4. For international travel, our company can also arrange for an after-sales engineer to visit you for installation and

commissioning. Please discuss any travel and catering issues in advance.

We also provide video installation guides for you to choose from, providing you with a comprehensive and multi-faceted solution.


5. Any material costs related to product quality during the warranty period will be borne by our company.


6. During the warranty period, we will provide free repairs due to improper use or environmental factors.

The materials and accessories used for repairs will be charged at cost only.


Build a fully functional high-end laboratory
Book Now